Project Porsche Rack Build...... part 1

Made a promise.... made a challenge.... to complete the frame in 1 day of a rack that measured 161" across holding 21 tanks..... did I do it??? You be the judge of that....


Started by getting 40 pieces of 2"x4"x8' the day before and then got home and unloaded and got an early start on some much needed sleep....



Not a Porsche... just a Rav4
OH and not to mention the day before we basically didn't sleep to have this ordered prepped to ship to Calgary... 
Today(Nov4th) at 3:30-4 a.m. I woke up and started cutting the wood to be prepped and brought to location to assembly....
Once almost finished cutting it was time to head to Home Depot to get some wood for the base and some boxes of deck screws! LOAD ER' UP!
Once we reach location of where new system is to be installed.... we begin....
Darn those support legs..... such tedious angle screwing work...
Finally....
Porsche fits! Now to do the other 2 sides with central air and water system.